Rough Grading and Initial Compaction
9:19
16:32
100.6K views
At 9:19 in
What Most WONT SHOW! Building and PRICING a Paver Patio 4k
What happens here
Utilize a skid steer to rough grade the newly excavated subgrade, creating a relatively flat surface. Follow this by compacting the entire area using a walk-behind plate compactor. This step is crucial for achieving a stable foundation that will prevent future settling of the paver patio.
Goal: Perform a rough grade of the excavated area and compact the subgrade to ensure stability before adding base materials.
Tools and materials
- Hearing Protection
- Plate Compactor (Tomahawk)
- Skid Steer (ASV RT-75 Posi-Track)
- Water