Base Material Delivery and Spreading
12:12
16:32
100.6K views
At 12:12 in
What Most WONT SHOW! Building and PRICING a Paver Patio 4k
What happens here
Arrange for delivery of recycled class 5 crushed rock base material. Use a dump truck to deposit the material strategically around the patio site. Employ a skid steer to spread the base material roughly across the entire excavated area. The initial layer should be approximately 6 inches deep, providing a solid foundation for the pavers. Use rakes for finer spreading and leveling before final screeding.
Goal: Deliver and spread the crushed rock base material, ensuring an even layer across the entire patio area.
Tools and materials
- Dump Truck
- Rakes
- Skid Steer Loader