Site Clearing and Material Delivery
5:29
24:29
64.4K views
At 5:29 in
we find BURIED Utilities the WRONG way!
What happens here
An existing fire ring made of bricks and a large amount of grass and turf need to be removed from the area designated for the new patio. The crew uses the Kubota skid steer to remove the fire ring bricks and load them into the machine's bucket for disposal. A flat plate compactor is unloaded from the truck, which will be used for compacting the sub-base materials. A dump trailer brings in a pile of recycled Class 5 material (road millings composed of pulverized and crushed asphalt/gravel) to be used as the sub-base.
Goal: Remove existing structures and prepare the sub-base material
Tools and materials
- Dump Trailer — Delivering sub-base material
- Kubota SVL 65-2 Skid Steer Kubota — Removing the fire ring and preparing the ground
- Plate Compactor Tomahawk — Compacting the sub-base material
- Shovel — Assisting with material removal
- Bricks N/A — Removed from the existing fire ring
- Grass and Turf N/A — Removed from the patio area
- Recycled Class 5 Material — Used as the sub-base for the patio
What they say
(681 characters)Hide
What they say
(681 characters)Auto-generated from the video audio.