Demolition of the Pool Walls
At 6:53 in
We find a Surprise Buried in the walls #buriedtreasure
What happens here
The demolition process begins with a yellow Kobelco excavator. The operator, Tim, uses the excavator's bucket with a static thumb attachment to systematically break down the concrete walls of the old swimming pool. He carefully works to move the large concrete pieces, first breaking them away from the remaining structure (the adjacent building) and then consolidating them into a pile within the empty pool basin. This involves precise movements to avoid damaging the nearby building. During this process, a blue 'Bromo-Seltzer' bottle, dating back to 1907-1911, is discovered among the debris. The narrator explains that bromides, once used in such products, were later withdrawn due to toxicity, making this a poisonous historical artifact.
Goal: Break down and consolidate the concrete walls of the swimming pool.
Tools and materials
- Hard Hat — Head protection during demolition
- Hearing Protection — Protecting ears from loud machinery noise
- Kobelco Excavator Kobelco — Breaking and moving large concrete pieces
- Safety Glasses — Eye protection from flying debris
- Static Thumb Attachment Carlson — Gripping and manipulating concrete debris
- Bromo-Seltzer Bottle Emerson Drug Co — Discovered during excavation, a historical artifact
What they say
(1,364 characters)Hide
What they say
(1,364 characters)Auto-generated from the video audio.