Skip to main content

Controlled Demolition of Small Building

7:25
24:12
25.1K views

At 7:25 in

We find a Surprise Buried in the walls #buriedtreasure

What happens here

With precision, the excavator starts to dismantle the small building. The operator's main focus is to 'peel' the building away from its connection points with the existing main house and the pool's remaining foundation without causing damage to the house. This requires delicate handling and strategic application of force to break the building's structural integrity. A worker may assist manually to clarify attachment points or guide the demolition process, ensuring a clean separation.

Goal: The excavator meticulously begins demolishing the small building adjacent to the pool, carefully separating its foundation from the pool structure and the main house while preserving nearby elements.

Tools and materials

  • Excavator

What they say

Hide

Timmy decided he couldn't help but want to play to have fun running running equipment is a little like therapy though you're having a bad day go hop in a piece of equipment and play [Music] foreign see if you can peel this away from the house without wrecking the house I don't think so let's see if you can do it uh just see if it just see if you can do it [Music] I like to give them a challenge oh now he's gotta cheat that's cheating cheater yeah the whole thing's sitting on there huh no give it a shot yeah but if you do it gentle enough you could probably get her to rest because it's got footings back here I wonder if we should take this I'll just take the subgrade right now and then we can work our way let's leave this till you have the demo of the house you can't do it can you well if I do it I think it's just gonna collapse and want to fall in then we got a broken window mess and okay you know I mean yeah people making that side of things because it's sitting on there once you

Auto-generated from the video audio.