Foundation Pile Installation
1:15
47:54
130.9K views
At 1:15 in
We Built My Best Friend the NICEST Deck in the Neighborhood!
What happens here
After demolition, the area where the new deck will be built is prepared. This involves using a mini excavator equipped with an auger attachment to drill holes for the foundation piles. The helical piles are then screwed into the ground, providing a stable and secure base for the new deck structure. This step is crucial for the long-term stability and safety of the deck. During this process, a lead carpenter ensures the accurate placement and depth of each pile.
Goal: Install stable foundation piles for the new deck.
Tools and materials
- Auger Attachment — Drilling precise holes for the helical piles
- Helical Piles — Providing a stable foundation for the deck
- Level — Ensuring posts are perfectly vertical and aligned
- Mini Excavator Supreme Skidsteer — Drilling holes for and installing foundation piles