Finalize Exterior Grading and Drainage
6:26
11:03
7.5K views
At 6:26 in
Waterproofing contractors HATE when you know THIS
What happens here
The video revisits the outdoor work, showing the crew finalizing the regrading and fabric installation around the house, including working around an exterior air conditioning unit and narrow sections. The speaker explains his personal preference for preventing water from entering the basement in the first place, rather than relying on interior drain tile systems that collect water after it has already infiltrated the foundation. He highlights that interior systems require pumps and battery backups, which can fail during power outages, making exterior prevention more reliable.
Tools and materials
- Landscape Fabric
- Rakes
- Shovels
What they say
(1,556 characters)Hide
What they say
(1,556 characters)Auto-generated from the video audio.