Ensure Proper Grading and Drainage Around Sill Plate
At 8:36 in
Waterproofing contractors HATE when you know THIS
What happens here
The video strongly emphasizes that even with a properly anchored sill plate, moisture management is paramount. After securing the sill plate, it is critical to implement positive grading around the house. This means the ground should slope away from the foundation at a rate of at least 1 inch per foot for the first 6 feet, or as per local codes. The speaker explicitly states that the grade should never be higher than 8 inches below the sill plate. This allows the sill plate to remain exposed and prevents moisture from wicking up into the wood. Proper downspout extensions and other drainage solutions should also be in place to direct water far away from the foundation. This proactive approach prevents water infiltration, mold growth (as shown in the basement at 9:20), and preserves the integrity of the sill plate and foundation anchors.
Goal: Post-installation, ensure the exterior grading around the foundation is sloped away from the house, maintaining at least 8 inches of exposed concrete foundation below the sill plate to prevent moisture issues.
Tools and materials
- Level
- Rake
- Shovel
- Tape Measure
- Topsoil or Fill Dirt N/A
What they say
(1,806 characters)Hide
What they say
(1,806 characters)Auto-generated from the video audio.