Skip to main content

Install Retaining Wall Blocks and Drainage

4:00
29:38
128.4K views

At 4:00 in

Wall FAILURE about to hit house-Plus we pull a mean one! START to FINISH 4 k Wall build

What happens here

The retaining wall blocks are meticulously laid, ensuring each course is level and properly aligned. Special attention is paid to 'step-downs' in the wall's base, which are more complex than 'stepping up' and require precise measurements to integrate with the surrounding grade. Pins are inserted into the blocks to secure each course. During construction, the drainage system is installed directly behind the blocks, consisting of a perforated pipe embedded in gravel. A separate solid pipe is installed for house downspout drainage, located outside the retaining wall's drainage zone to prevent excess moisture behind the wall. The wall blocks are 'toed in' with backfill as construction progresses to prevent movement.

Goal: Construct the block wall and establish an effective drainage system behind it.

Tools and materials

  • Hand Level — Checking level and alignment of blocks
  • Perforated Drainage Pipe — Collecting water behind the retaining wall
  • Pins — Securing layers of retaining wall blocks
  • Retaining Wall Blocks — Building the retaining wall structure
  • Rubber Mallet / Sledgehammer — Adjusting block placement and ensuring proper seating
  • Solid Drainage Pipe — Diverting house downspout water away from the retaining wall

What they say

Hide

top block won't fit so we've got to make sure that we get the base elevation exactly right [Music] now most of you guys that have built retaining walls and all that this part of the project is the most time-consuming takes yeah it takes the longest to do that's what most time-consuming basically means but you've got to get this part right or the rest of your wall will fail now before we get too far along on the project we're gonna tow this wall in right away because if any of those blots get kicked or shifted it's gonna throw everything else off so before we actually start the building process we just make sure that we get everything told in and tightened up [Music] better use my legs and run before it is too late a flea [Music] so this drain tile is not for the retaining wall it's actually for the downspout of the house this will get connected into that downspout so this is a four inch solid piece of pipe as it gets ran separately outside of our drainage zone of the retaining wall we never want to put anything that we don't have to in that drainage zone if it's not directly helping there's a painting wall out [Music] so now we're getting to a tricky part of the job and we're gonna actually show you what that is and that's stepping down a base stepping up your base easy-cheesy stepping down your base not at all [Music] alright step down so I'd like to take this opportunity to introduce you a little bit more to a couple of my guys the guy in the gray shirt his name is Blaine and he's over 50 years old and has actual master's degree in mathematics he literally works for me just for fun and to stay in shape Blaine's worked with us for years now and he's just freaking awesome at his job so that's bling the guy in the orange dirt monkey hat that's Sam he's new to us a couple years ago but fiery go Gator and what a great guy he is as well you know I just I really appreciate my crew loved these guys without them none of this stuff would be possible so you'll get to see these to get this bass block in I'll shut up now just came out with the personal air-conditioner leg on a belt right you wear like this long sleeve things you tape the sleeves around your hands in up and then it's like you're sure she Clips on the back here and it recirculates it's the whenever we're working on a project we try to avoid step downs if at all possible that's why you'll always see us when we start building a retaining wall from the lowest point and build upward because if you start…

Auto-generated from the video audio.