Install Drainage Pipes and Fabric
1:10
16:13
6.7K views
At 1:10 in
Vlog 4 - Retaining Wall and Deck Board Installation
What happens here
After the trenches are dug, a worker uses a shovel to clear debris and prepare the trench bed. PVC pipes are then laid into the prepared trenches, carefully connected to ensure a continuous path for water flow. Once the pipes are in place, a grey landscape fabric is unrolled and placed over the pipes, creating a protective barrier. Finally, the trenches are backfilled with excavated dirt, burying the drainage system and fabric.
Goal: Establish the drainage system to manage water runoff
Tools and materials
- Landscape Fabric — Protecting pipes from clogging
- PVC Pipes — Forming the drainage channels
- Shovel — Clearing debris and preparing trenches
What they say
(2,082 characters)Hide
What they say
(2,082 characters)Auto-generated from the video audio.