Install Turbochargers and Intercooler
At 15:16 in
Twin Turbo Escalade Runs Again! The LSXcalade 427 2.0 FIRED UP!! (Final Assembly & Problems)
What happens here
Carefully connect the turbo oil drain lines, ensuring they are tightened with the turbo housing off for easier access. Mount the turbochargers onto the headers. The video suggests leaving the oil drain lines connected during this process to avoid difficulties. Remove the front bumper to access and adjust the intercooler pipes, which may have shifted during other installations. Ensure all intercooler pipes are properly aligned and secured. Finally, install the coolant temperature sensor into the engine head, as this is a critical component that can be easily overlooked.
Goal: Integrate turbos and intercooler into the engine system.
Tools and materials
- Coolant Temperature Sensor — Monitoring engine coolant temperature
- Intercooler Pipes — Routing compressed air to the engine
- Oil Drain Lines — Connecting turbos to the engine's oil system
- Turbochargers Precision Turbo — Forced induction for increased engine power
- Wrench Set — Tightening connections and mounting turbos
What they say
(1,615 characters)Hide
What they say
(1,615 characters)Auto-generated from the video audio.