Laying and Stepping Up Base Blocks
2:56
17:09
365.6K views
At 2:56 in
Turning a STEEP Hill into a Flat yard #1
What happens here
After clearing the timbers, the base course of the retaining wall blocks is laid. On this steep slope, instead of stepping the slope down, the blocks are 'stepped up' by placing one block directly on top of another in certain sections. This technique allows for all courses of blocks to remain aligned, which is crucial for structural integrity and aesthetics. The blocks are carefully leveled and aligned using a hand level and string lines.
Goal: Establish a level and stepped-up base course for the retaining wall.
Tools and materials
- Hand Level — Ensuring blocks are level
- Retaining Wall Blocks Versa-Lok Standard — Forming the base courses of the retaining wall
- Rubber Mallet — Tapping blocks into place for fine adjustments without damage
- String Line — Maintaining straightness and alignment of block courses
What they say
(328 characters)Hide
What they say
(328 characters)Auto-generated from the video audio.