Repeat Wall Building and Backfilling Cycle
At 11:59 in
Trouble strikes the wall rebuild
What happens here
Once a section of the boulder wall is constructed and the initial backfill layer is compacted, continue the process. Lay the next section of geotextile fabric over the compacted backfill. Then, carefully place the next course of boulders, ensuring they are stable and set back slightly from the previous course to create a stable slope. Follow this immediately with another lift of backfill soil and subsequent compaction using the vibratory rammer. Maintain an ongoing cycle of boulder placement, backfilling, and compaction, working in sections along the length and height of the wall. This layered approach is critical for preventing future wall movement and ensuring the overall stability and longevity of the retaining structure.
Goal: Continuously repeat the steps of placing boulders, laying geotextile, adding backfill, and compacting until the desired retaining wall height is achieved, ensuring structural integrity throughout.
Tools and materials
- Excavator
- Skid Steer
- Vibratory Rammer
- Backfill Soil
- Geotextile Fabric
- Large Boulders