Construct Retaining Wall Layers
At 0:17 in
Trouble strikes the wall rebuild
What happens here
Begin by excavating a foundation trench for the retaining wall, extending approximately 3 feet in front of any existing, failed wall structure to provide ample space for the new, stable foundation. Place the largest, 'beefy' boulders at the very bottom of the wall, ensuring they are deeply embedded and have a wide bearing surface. Subsequent layers should consist of progressively smaller rocks, building the wall upwards like a pyramid ('big, medium, small'). This method ensures that the weight of the upper layers is supported by the wider, more stable base, minimizing movement and potential failure. Use heavy machinery like an excavator with a hydraulic clamp for precise and safe placement of these large stones.
Goal: This step involves the strategic placement of large boulders to form the retaining wall, ensuring proper embedding and layering for inherent stability.
Tools and materials
- Excavator (e.g
- Daewoo 75V)
- Hydraulic Clamp (e.g
- Attachments by Hydro-Tec)
- Large Boulders
- Skid Steer (e.g
- Kubota SVL75)