Lowering Subsequent Dock Sections Down Hill
7:26
16:04
13.9K views
At 7:26 in
TOURING the NEW Property & UPGRADING the Dock
What happens here
The remaining dock sections are moved down the same steep hill following the technique established in the previous step. Two people guide each section from the front, while another person manages the control rope from the top of the hill. This process is repeated for each subsequent section until all pieces are safely at the water's edge, ready for assembly.
Goal: Transport all dock sections to the water's edge.
Tools and materials
- Floe Dock Sections Floe — The dock sections being moved
- Heavy-Duty Rope — Controlling the descent of the dock sections
What they say
(421 characters)Hide
What they say
(421 characters)Auto-generated from the video audio.