Initial Demolition and Site Prep
At 0:00 in
This SHADY home builder cut corners
What happens here
The project begins with an introduction to the site, which features an old, seemingly poorly constructed retaining wall made of core-filled cinder blocks with a footing, and an awkwardly curved driveway. The demolition of the first section of the wall and a portion of the driveway is initiated using an excavator and a skid steer. Workers use a demolition hammer to break down sections of the concrete. During this initial phase, a centipede is observed on the ground, and a nest of baby red squirrels is discovered within the debris, prompting their safe relocation for rehabilitation.
Goal: The first phase involves the heavy demolition of existing concrete retaining walls and a curved driveway. This step highlights the robust nature of the old construction, requiring significant effort and heavy machinery, and includes the discovery of local wildlife during the process.
Tools and materials
- Demolition Hammer (Stihl TS 420 Cutquik)
- Excavator (Bobcat 331)
- Personal Protective Equipment (PPE)
- Shovel
- Skid Steer Loader (Kubota SVL 75-2)
- Baby Red Squirrels
- Centipede
- Concrete blocks (old)
- Earth/Soil
What they say