Constructing First Retaining Wall
At 3:45 in
This SHADY home builder cut corners
What happens here
Following the demolition, the crew begins constructing the first new retaining wall along the straightened driveway line. The process involves carefully laying interlocking concrete blocks. Workers ensure each block is perfectly level and aligned, often using a level tool and adjusting with a hammer. Geo-grid material is integrated between layers of blocks for enhanced stability and strength. As the wall progresses, small pieces of aggregate (gravel) are added behind the blocks, and a plate compactor is used to ensure tight compaction, further reinforcing the structure. During this phase, several cicadas are observed emerging from the ground near the newly laid blocks, an interesting natural occurrence during the construction.
Goal: This step details the meticulous construction of the first new retaining wall, focusing on proper block placement, leveling, and compaction to ensure structural integrity and a clean, straight line.
Tools and materials
- Level Tool
- Plate Compactor
- Rubber Mallet/Hammer
- Shovel
- Tape Measure
- Aggregate (Gravel)
- Cicadas
- Geo-grid
- Interlocking Concrete Blocks
What they say
(1,534 characters)Hide
What they say
(1,534 characters)Auto-generated from the video audio.