Skip to main content

Unboxing and Positioning Roller Cabinet

8:43
20:22
9.6K views

At 8:43 in

This Is Why You Don't Take Cheap Side Jobs

What happens here

The assembly process begins with the 'US General 72" Triple-Bank Roller Cabinet'. The team carefully removes the outer cardboard packaging and lifts the main roller cabinet off its shipping pallet. They use sturdy foam blocks to elevate one side of the cabinet, allowing them to slide out the wooden pallet from underneath. This method ensures that the heavy cabinet, with its pre-attached caster wheels (which are visibly spring-loaded for shock absorption), is safely transferred from the pallet to the shop floor. This step is crucial for preparing the base unit for the top chest and side lockers.

Tools and materials

  • Foam Blocks
  • Shipping Pallet
  • Utility Knife

What they say

Hide

>> Is this the last one, Jay? >> Yeah. >> Slide the pallet out now. You can't really go anymore. Unless it goes this way. Oh, never mind.

Auto-generated from the video audio.