Skip to main content

Assembling Top Chest and End Locker

9:18
20:22
9.6K views

At 9:18 in

This Is Why You Don't Take Cheap Side Jobs

What happens here

After the roller cabinet is on its wheels, the 'US General 72" Triple-Bank Top Chest' is unboxed. The team carefully lifts the top chest and aligns it on top of the roller cabinet. Given the significant weight of the top chest, this task requires at least two people and precise coordination to ensure proper placement and prevent damage to both units. Once the top chest is securely seated, the next step involves unboxing the '22" End Locker'. This smaller, vertical cabinet is then lifted and carefully attached to the side of the main roller cabinet, completing the modular assembly of a single large tool storage unit. This entire assembly process is repeated for two additional sets of roller cabinets, top chests, and end lockers.

Tools and materials

  • US General 22" End Locker
  • US General 72" Triple-Bank Top Chest

What they say

Hide

Yeah, don't move anything. Just trip over all that crap, boys. >> That's how we normally do it. >> Yep. Remember, always lift with a twisting heaving motion. >> We got to lift from the bottom or we're not going to be able to get it high enough. >> Yeah, I can't. >> Maybe there's >> It makes it heavy real quick. >> It's not the end of the world. >> That's heavy. >> Especially trying to get your little nose pickers in that crevice. >> going to pinch your fingers.

Auto-generated from the video audio.