Initial Site Preparation and Excavation
0:00
15:26
15.3K views
At 0:00 in
This guy Ripped off his CREW
What happens here
The project begins by identifying the area where the retaining wall will be installed. This involves initial site assessment and the commencement of excavation. Heavy machinery, specifically a mini excavator, is used to dig the main trench for the retaining wall, while a skid steer assists with moving large quantities of soil and debris. Workers with shovels help define the trench lines and clear smaller areas. The existing concrete curb is targeted for removal.
Goal: Clear the site and excavate the main trench for the retaining wall.
Tools and materials
- Jackhammer — Breaking up stubborn concrete, such as the existing curb
- Mini Excavator Daewoo — Digging trenches and large-scale soil removal
- Shovels Various — Manual excavation, defining trench edges, and fine-tuning soil removal
- Skid Steer Kubota — Moving excavated soil, debris, and materials
- Concrete Curb Debris N/A — Material removed from the site
- Excavated Soil N/A — To be removed or stockpiled for later use