Establish Crushed Rock Base
7:47
15:26
15.3K views
At 7:47 in
This guy Ripped off his CREW
What happens here
Once the trench is excavated and leveled, a layer of crushed rock is deposited into the trench using a skid steer with a bucket. This rock layer serves as the foundation for the retaining wall blocks. Workers manually spread the crushed rock evenly across the trench bottom and then compact it thoroughly using a plate compactor. This compaction is essential to create a stable, non-settling base for the wall.
Goal: Create a stable and compacted crushed rock foundation for the retaining wall.
Tools and materials
- Plate Compactor — Compacting the crushed rock base to ensure stability
- Rake — Fine leveling of the crushed rock
- Shovels Various — Spreading and leveling the crushed rock by hand
- Skid Steer with Bucket Kubota — Transporting and distributing crushed rock into the trench
- Crushed Rock — Creating a stable and well-draining foundation for the retaining wall blocks
What they say
(535 characters)Hide
What they say
(535 characters)Auto-generated from the video audio.