Property Development and Land Management
At 3:29 in
They FOUND 15 bodies BURIED on his land!
What happens here
The property owner details various land improvements and management strategies. He mentions building a gravel road across the property for under $10,000, including the initial rock layers and earthwork. Since there is no well, an off-grid water system consisting of a 450-gallon tank is used, with filters installed before the pump and a whole-house filter after. This system provides non-potable water for showering and restrooms, sourced from a town well. He also describes the ongoing process of clearing trails through wooded areas, some by actively cutting, others from naturally fallen trees, and consolidating debris into burn piles. He also jokingly refers to owning a dilapidated 1961 Impala car that needs significant restoration.
Goal: Learn about practical solutions for developing infrastructure and managing natural elements on large properties.
Tools and materials
- 1961 Impala Chevrolet — A long-term restoration project or parts car
- 450-gallon Water Tank — Storing water for the off-grid system
- Chainsaw — Cutting fallen trees and brush for trail clearing
- Earthmoving Equipment — For initial earthwork and road grading
- Gravel — Constructing a cost-effective private road
- John Deere Gator John Deere — Transporting materials and personnel across the property
- Water Filters — Filtering water for general use (non-potable)
- Water Pump — Pressurizing water from the tank to the property's uses
What they say
(2,281 characters)Hide
What they say
(2,281 characters)Auto-generated from the video audio.