Continue Building Wall Courses
At 0:26 in
These Serafina fire pit kits from Nicolock go together like a dream! Easy Peasy!!
What happens here
Continue building the fire pit walls by laying subsequent courses of textured wall blocks. For each new course, apply a construction adhesive designed for masonry between the layers to ensure a strong bond (not explicitly shown but recommended for durability). Stagger the vertical joints of the blocks from the course below for increased structural integrity. Use a spirit level to check the level of each block both front-to-back and side-to-side, and use the rubber mallet to make fine adjustments. Repeat this process until the desired height for the fire pit walls is achieved, typically 2-3 feet high.
Goal: Construct the fire pit walls to the desired height.
Tools and materials
- Rubber Mallet — Making precise adjustments to block placement
- Spirit Level — Ensuring each course and block is perfectly level
- Textured Wall Blocks — Building up the remaining courses of the fire pit walls
- Construction Adhesive PL Premium — Securing the wall blocks together for enhanced durability