Continue building the fire pit walls by laying subsequent courses of textured wall blocks. For each new course, apply a construction adhesive designed for masonry between the layers to ensure a strong bond (not explicitly shown but recommended for durability). Stagger the vertical joints of the blocks from the course below for increased structural integrity. Use a spirit level to check the level of each block both front-to-back and side-to-side, and use the rubber mallet to make fine adjustments. Repeat this process until the desired height for the fire pit walls is achieved, typically 2-3 feet high.

Goal: Construct the fire pit walls to the desired height.

Tools and materials

  • Rubber Mallet — Making precise adjustments to block placement
  • Spirit Level — Ensuring each course and block is perfectly level
  • Textured Wall Blocks — Building up the remaining courses of the fire pit walls
  • Construction Adhesive PL Premium — Securing the wall blocks together for enhanced durability