Final Pipe Installation in Trench

0:33
1:00
8.1K views

At 0:33 in

There won’t be any ponding on this patio! Water is going to wicked away like a water slide!!

What happens here

The long, continuous sections of assembled PVC pipe, now forming the complete drainage network with its various branches, are carefully maneuvered and placed into the bottom of the excavated trench. Workers ensure that the pipes are properly seated, maintaining the established grade and alignment, ready for the next stages of the drainage system installation.

Goal: The fully assembled and connected PVC drainage system is carefully lowered and positioned into the prepared trench.

Tools and materials

  • Assembled PVC Pipe System