Install Base Layers of Boulder Wall
At 2:18 in
The Ugly Hill gets a makeover
What happens here
Once the initial earth-moving is complete, the focus shifts to constructing the base of the boulder retaining wall. Large, robust boulders are carefully selected and maneuvered into place using the excavator. The operator's skill is essential for positioning these heavy stones to create a strong and level first course. As the boulders are laid, sections of geotextile fabric are unrolled and placed directly behind them. This permeable fabric acts as a critical barrier, preventing soil from washing through the gaps between the boulders while still allowing water to drain, thus maintaining the wall's structural integrity and preventing erosion.
Goal: Heavy boulders are strategically placed by an excavator to form the foundation of the retaining wall, with geotextile fabric installed behind them for soil stabilization.
Tools and materials
- Excavator (Daewoo 75V)
- Geotextile Fabric (Landmark branded)
- Large Boulders
What they say
(795 characters)Hide
What they say
(795 characters)Auto-generated from the video audio.