Unconventional Footing Compaction

2:33
12:50
163.1K views

At 2:33 in

The Most Money I've lost on any one Job

What happens here

To achieve the required compaction levels for the building footings, especially the upper layers, the narrator employed an unconventional 'compression compaction' technique. Instead of standard compactors, he used an old 1976 White Road Boss dump truck, intentionally overloading it to 60,000-70,000 pounds (well above its legal capacity of 53,000 pounds) with dirt. He then drove this heavily laden truck repeatedly around all the footings. This method achieved an impressive 107% compaction, far exceeding the 97% requirement. However, this success greatly angered the project supervisor, who saw it as a deviation from standard procedures and a personal affront.

Goal: The narrator describes using a heavily overloaded dump truck for compression compaction of building footings, a method that defied traditional expectations but successfully exceeded compaction targets, leading to a strained relationship with the project supervisor.

Tools and materials

  • White Road Boss Dump Truck (1976)
  • Dirt/Fill Material

What they say

Hide

nice as well it's got to be tested anyway we've got to have verification that we're hitting that 97% so just test it just check it out and do it well unfortunately what happened was I didn't hit 97% I hit a hundred and seven percent I went way over on my compaction and I say unfortunately because what I did by going way over was I entirely proved this project supervisor wrong and that doesn't give me an advantage that actually gives me a disadvantage because even though I proved him wrong I've also successfully pissed him off he's no longer in my corner on this jobsite and so this old farm country boy that has next to no equipment is actually accomplishing the job but not in the ways he's used to working with the bigger companies that have dozers and excavators and compactors at etc etc and so I would start to see him do little things like he would start to sabotage me in little micro ways and I would notice it but I would just keep working I mean I was just built to work plain and simple but a big red flag popped up one day when he came in and we were prepping the inside of the entire building now this is a Menard superstore so this is a massive amount of space that we've got to prep and he looked at me and said I expect this entire interior pad to be concrete ready by tomorrow morning we had rod earth at this point we weren't even close to having a pad that could support concrete and like Oh No so he left he didn't stick around I don't know what he was doing or where he went but I got on the horn to the aggregate pit and I ordered $45,000 worth of aggregate to be shipped in that day we are talking about n dump after end up in a continual stream now to keep up with them at this point I had an excavator and I had a skid loader I had a New Holland skid loader New Holland 180 and that's it and a dump truck so I rented two dozers I rented two Komatsu d40 one-piece and I had him outfitted with mass and mass means I could set my rip my grade lasers up on each mast and could grade and so it was my crew was me my dad and Tim and we worked all day long and we didn't even get close to it and so as the day was coming and I knew the trucks were gonna start to stop I decided to have them strategically placed oil throughout the entire building path so that as we would go from one aggregate pile we could then push the soil to the next aggregate pile we would never have to touch the sub base with our tracks and worry about contaminating it but it also meant we weren't…

Auto-generated from the video audio.