Rapid Interior Pad Preparation

5:53
12:50
163.1K views

At 5:53 in

The Most Money I've lost on any one Job

What happens here

After proving the supervisor wrong on compaction, the narrator was challenged to prepare the entire interior pad of the large Menards Superstore for concrete by the next morning. With minimal equipment (an excavator, a New Holland 180 skid steer/Bobcat, and a dump truck), he ordered $45,000 worth of aggregate to be shipped continuously throughout the day. To keep up with the incoming material and achieve precise grading, he rented two Komatsu D41P bulldozers, equipped with masts for laser grading. The narrator, his father, and Tim worked tirelessly through the night, using the dozers to strategically place and grade the soil, avoiding contamination of the sub-base. By morning, the entire pad was ready for concrete, once again surprising and frustrating the project supervisor.

Goal: Faced with an overnight deadline to prepare a massive interior pad for concrete, the narrator orchestrated a continuous flow of aggregate and deployed two bulldozers with laser grading systems, successfully completing the task by morning despite limited resources and working through the night.

Tools and materials

  • Dump Truck
  • Excavator
  • New Holland 180 Skid Steer (Bobcat)
  • Aggregate (Soil/Fill Material)

What they say

Hide

reps from Menards he had them come out with him he had every person inside of the office that was his superior come out to the job site with him because his plan was to come out and show that we weren't capable of handling this project and have me fired I think he was pretty much setting me up for sabotage which if you want to get rid of somebody that's a good way to do it but when he showed up he was even more mad than the time before when I when I did the compression package and improved wrong because now the entire pad is done we're done we're wrapped up we're looking at each other sitting on our dozers going what do you want done next boss and he's like how did you do all this I said we just worked all night long and he he had the whole entourage and the entourage looked at him and goes what's wrong with this project what's wrong with this contractor and so we then again we didn't make a friend we actually made an enemy and these aren't good things these are just real things and what I learned from that is just because you have a project supervisor doesn't mean the project supervisor is automatically going to like you and it doesn't mean they're going to have your best interests in mind I learned that you've got to treat each person individually and understand that some of them are gonna favor you a little bit more than others maybe I'm wrong with it I don't know but that's my story with the Menard superstore holy crap what just one story it's like yeah it's a good story if I go to the next one [Music] alright guys so this is the project that I lost the absolute most money on and it's somewhere between 90 and $100,000 but it could have been a heck of a lot worse because not only did I not get paid for this retaining wall the contractor that I installed it for tried to sue me after the wall was complete and this is going to be the absolute craziest story I can't even believe I I'm telling you this story and it all stems from one little control point up in the middle of the field there is a spot when this whole stadium would be built that had to stay in place and what happened was that control point got destroyed intentionally by the contractor that was building the stadium because it was in his way and what happened was without that control point the surveyors came out here and staked the wall but they didn't stake the wall