Rapid Interior Pad Preparation
At 5:53 in
The Most Money I've lost on any one Job
What happens here
After proving the supervisor wrong on compaction, the narrator was challenged to prepare the entire interior pad of the large Menards Superstore for concrete by the next morning. With minimal equipment (an excavator, a New Holland 180 skid steer/Bobcat, and a dump truck), he ordered $45,000 worth of aggregate to be shipped continuously throughout the day. To keep up with the incoming material and achieve precise grading, he rented two Komatsu D41P bulldozers, equipped with masts for laser grading. The narrator, his father, and Tim worked tirelessly through the night, using the dozers to strategically place and grade the soil, avoiding contamination of the sub-base. By morning, the entire pad was ready for concrete, once again surprising and frustrating the project supervisor.
Goal: Faced with an overnight deadline to prepare a massive interior pad for concrete, the narrator orchestrated a continuous flow of aggregate and deployed two bulldozers with laser grading systems, successfully completing the task by morning despite limited resources and working through the night.
Tools and materials
- Dump Truck
- Excavator
- New Holland 180 Skid Steer (Bobcat)
- Aggregate (Soil/Fill Material)
What they say
(2,368 characters)Hide
What they say
(2,368 characters)Auto-generated from the video audio.