Retaining Wall Construction Dispute
At 8:34 in
The Most Money I've lost on any one Job
What happens here
The narrator recounts a separate, highly problematic project involving the construction of a retaining wall for a stadium track. A critical control point, essential for accurate surveying and placement of the wall, was intentionally destroyed by the general contractor building the stadium, as it was 'in his way.' Without this precise control point, the surveyors hired by the contractor mistakenly staked the top of the wall as the bottom, causing the entire retaining wall to be constructed inches off specification. After the wall was completed, the general contractor attempted to sue the narrator for the cost of rebuilding the entire structure, which was estimated at $90,000 to $100,000, threatening to financially ruin the narrator's company.
Goal: The narrator details a project involving a retaining wall for a stadium track where a crucial survey control point was deliberately destroyed by another contractor, leading to the wall being built inaccurately and subsequent legal action against the narrator.
What they say
(2,012 characters)Hide
What they say
(2,012 characters)Auto-generated from the video audio.