Skip to main content

Final Fixture Installation & Reveal

19:12
20:53
57.2K views

At 19:12 in

The Most DIFFICULT Bathroom Build I've Ever Done

What happens here

Install the showerhead and mixing valve trim onto the tiled shower wall. Mount the vessel sink faucet onto the vanity countertop, connecting the water lines as per manufacturer instructions. Hang the arched mirror above the vanity, ensuring it's centered and securely fastened. Install any additional wooden shelving, towel rings, and a toilet paper holder. Finally, set and connect the toilet. Clean all surfaces thoroughly for the final reveal of the completed and stylish bathroom.

Goal: Install all remaining bathroom fixtures and accessories, including shower components, vanity faucet, mirror, shelving, and towel holders.

Tools and materials

  • Drill/Screwdriver
  • Level
  • Showerhead & Fixtures
  • Silicone Caulk
  • Toilet
  • Towel Rings/Holders
  • Vanity Mirror
  • Vessel Sink Faucet
  • Wooden Shelf

What they say

Hide

spent on this. See you in a minute. All right, guys. Got everything touched up, dialed in, and cleaned up. There's a few things that still need the finishing touches like the electrical outlets need to be put in, the light fixtures need to be put in, and the tub overflow thing. But, that is for the HVAC, electrician, and plumbers to come and finish that off cuz they included that in their bid. I don't have to go and waste my money on it. But, let me show you what we came up with. Check this out.

Auto-generated from the video audio.