Skip to main content

Prepare Specialized Rigging Equipment

0:53
14:40
56.7K views

At 0:53 in

The Most dangerous Tree job I've seen. 4k video

What happens here

Before climbing or cutting, the crew prepares the rigging system. This includes connecting a large block and tackle system to a crane cable using shackles and pliers. The main block is fitted with multiple rigging slings (e.g., one 35-foot sling and two 25-foot slings), designed for 'spider leg rigging' to balance the load of tree sections during removal. The climber also inspects their personal climbing harness and associated gear.

Goal: This initial step involves preparing and inspecting the advanced rigging equipment, including a large block and tackle system with multiple slings, essential for safely supporting and lowering heavy tree sections.

Tools and materials

  • Carabiners
  • Climbing Ropes
  • Large Block and Tackle System
  • Pliers
  • Rigging Slings
  • Shackles

What they say

Hide

in here our two girl grandson he comes in plays with her all the time she just rolls over wants to play [Applause] [Music]

Auto-generated from the video audio.