Prepare Specialized Rigging Equipment
0:53
14:40
56.7K views
At 0:53 in
The Most dangerous Tree job I've seen. 4k video
What happens here
Before climbing or cutting, the crew prepares the rigging system. This includes connecting a large block and tackle system to a crane cable using shackles and pliers. The main block is fitted with multiple rigging slings (e.g., one 35-foot sling and two 25-foot slings), designed for 'spider leg rigging' to balance the load of tree sections during removal. The climber also inspects their personal climbing harness and associated gear.
Goal: This initial step involves preparing and inspecting the advanced rigging equipment, including a large block and tackle system with multiple slings, essential for safely supporting and lowering heavy tree sections.
Tools and materials
- Carabiners
- Climbing Ropes
- Large Block and Tackle System
- Pliers
- Rigging Slings
- Shackles
What they say
(122 characters)Hide
What they say
(122 characters)Auto-generated from the video audio.