Skip to main content

Implement Spider Leg Rigging for Stable Lifts

4:11
14:40
56.7K views

At 4:11 in

The Most dangerous Tree job I've seen. 4k video

What happens here

The rigging is attached to the tree section, with multiple slings (e.g., one 35-foot, two 25-foot) distributed to create a stable lifting point. The goal is to position the crane's hook directly over the section's center of gravity. This 'spider leg' technique ensures that when the cut is made, all slings are equally tensioned, allowing the crane to lift the piece straight up without dropping, twisting, or causing shock loading on the crane's boom, which is crucial for safety and control.

Goal: A specialized 'spider leg rigging' technique is applied by adjusting slings around the tree section, ensuring the crane lifts from the center of gravity for stable and shock-free removal.

Tools and materials

  • Rigging Slings
  • Tree Crane Hook/Block

What they say

Hide

okay that's it for now what we're doing these this is called spider leg rigging spider leg meaning it's sort of like a web okay I've got three straps on here this one 35 shorter ones or 25 what we do is position the ball over the center of gravity for the pick the pick being the piece that we're planning to sever from the tree and hoist up okay if you want to have it right at the center of gravity so that way all the slings are attention the same and when we make the cut that should fit straight up so there's no dropping there's no shock loading in this system because that's that's a bad thing in this system because the boom boo-boom doesn't like to bounce want everything to be static

Auto-generated from the video audio.