Skip to main content

Final Inspection and Project Completion

0:43
1:07
19.4K views

At 0:43 in

The most Dangerous Job for any Electrician #hendythesparky Fixing a 200 AMP Service LIVE🤯

What happens here

The final stage involves a visual inspection of the completed work. The service entrance cable (SEU) is now securely re-strapped along the entire length of the house siding, from the meter box all the way up to the top near the roofline. The narrator points out that the job was particularly challenging due to the house being on a slanted hill, confirming that the scaffolding was indispensable as a normal ladder would not have provided a safe or practical working solution. The project is declared finished, and customer satisfaction is implied.

Goal: Verify that the service cable is fully secured and the project is successfully completed.

What they say

Hide

foot's right there. Take a look at this. We got our SCU straps. Before it was ripped off, guys. This was ripped off completely. We restrapped it all the way to the top. And it was a challenge, guys, cuz right here basically on a hill. So, we had to get a scaffold. We couldn't use a normal ladder. But guys, all finished. Let's get it.

Auto-generated from the video audio.