Laying the Foundation Course of Retaining Wall Blocks
0:54
12:55
134.6K views
At 0:54 in
The General Contractor Threatened me
What happens here
The first course of retaining wall blocks is meticulously laid onto the compacted trench base. Each block must be set perfectly level, both front-to-back and side-to-side, using a spirit level. It is also important to ensure that adjacent blocks are aligned horizontally. This foundational layer is paramount, as any inconsistencies will be amplified in subsequent courses, affecting the overall stability and appearance of the finished wall. Adjustments are made by tapping the blocks with a rubber mallet or adding/removing granular material beneath them.
Goal: Establish a perfectly level and stable base layer for the retaining wall.
Tools and materials
- Retaining Wall Blocks — The primary building material for the wall
- Rubber Mallet — Making minor adjustments to block placement
- Spirit Level — Checking the levelness of each block
- Granular Base Material — To make fine adjustments to block height