Once a few courses of retaining wall blocks have been laid, it's time to install a drainage system and backfill. A perforated drainage pipe should be placed behind the base of the wall, typically wrapped in a filter fabric to prevent clogging. Following this, coarse granular material, such as gravel or crushed rock, is poured behind the wall. This material serves to reduce hydrostatic pressure and provide excellent drainage. The backfill should be added in layers (typically 6-8 inches thick) and each layer thoroughly compacted using a plate compactor before adding the next. This ensures proper density and prevents future settling.

Goal: Ensure proper drainage and stability by installing a drainage pipe and backfilling with compacted granular material.

Tools and materials

  • Excavator / Skid Steer ASV — Moving and placing large quantities of granular material
  • Filter Fabric — Wrapping the drainage pipe to prevent soil infiltration
  • Perforated Drainage Pipe — Collecting and diverting water from behind the wall
  • Plate Compactor — Compacting backfill material in layers
  • Shovels and Rakes — Spreading and leveling backfill
  • Gravel / Crushed Rock — Drainage layer behind the retaining wall

What they say

Hide

moving pieces to this puzzle now being able to balance all those moving pieces to the puzzle is one second of skills you've got to have that set of skills or the Project's going to go south on you pretty fast now you will if you jump into a commercial site often times you will be considered a subcontractor meaning there's a general contractor and he'll line up the concrete guy he'll line up the demo guy he'll line up the utility guy he'll line up the framing guy he'll line up all of these other guys and you are just one of those guys that he lines up now this is also the same guy that you have to invoice and here's where things get really tricky on a commercial site you invoice you can't invoice to the end of the month and then the contractor that you invoice has 2 months to pay legally so that means you wait till the end of the month to invoice then two more months so now you're three months out before you could ever hope and I say hope and I mean hope that the money comes in now a lot of times when the money's supposed to come in you're going to get an excuse from the contractor oh the owner didn't pay us we don't have the funds yet or something along those lines there's zero guarantee that when you're supposed to collect your money that you actually do collect your money but that's not the scariest thing about being a Commercial contractor let's get into it a little bit more coming up in a minute [Music] now as if everything I had just told you wasn't enough to cause you pause or hesitation here's where things get even more complicated and I'm talking about retainage on a commercial site it's worked into the contractor and every every contract is going to be different but there's what's called retainage and that is a percentage of the gross let's just say you're retaining W contract and I want to clarify something when I said I was one of the five largest in the midwest I'm talking about four installing retaining walls we were massive we did massive projects not for doing dirt work or demolition or anything like that but as a specialty contractor we were one of the biggest around in the midwest now back to retainage let's say our project is