Final Backfilling, Grading, and Capstone Installation

5:00
12:55
134.6K views

At 5:00 in

The General Contractor Threatened me

What happens here

After the retaining wall blocks reach the desired height and the granular backfill is complete, the remaining area behind the wall is filled with topsoil. This soil is then graded, typically sloping slightly away from the wall, to ensure proper surface water runoff and prevent ponding. At this stage, capstones are installed on the top course of the retaining wall blocks. Each capstone is secured with a strong construction adhesive, ensuring they are level and create a clean, finished look. The surrounding area is then prepared for its final use, which in this video includes adding wood chips for a playground surface.

Goal: Complete the structural elements of the wall and prepare the surrounding area for its final use.

Tools and materials

  • Capstones — Finishing the top course of the retaining wall
  • Construction Adhesive — Securing capstones to the retaining wall blocks
  • Shovels and Rakes — Fine grading and spreading materials
  • Skid Steer ASV — Moving and spreading topsoil and other landscaping materials
  • Spirit Level — Ensuring capstones are level
  • Topsoil — Final backfill and grading
  • Wood Chips — Surfacing for a playground area (as shown)

What they say

Hide

retainage let's say our project is $100,000 the contract says there's a 10% retainage meaning I can bill as soon as my job is done I'll bill that $100,000 straight up and I'll collect $90,000 back and the contract is usually anywhere from an additional 3 months to 6 months to a year and I've seen retainage held for five years five years you know what they're doing they're collecting interest on your money that's your money and you can't legally collect it because they've got it worked into the contract and it's not the profits it's not 10% on the profit we're talking about 10% of the gross of the job so if your job is $100,000 you Bill them you only get $90,000 and six months to a year later that's typical you'll be able to collect that extra $10,000 one of them one of my contracts was 5 years and they waited 5 years before I finally was able to collect that remaining balance and do you see how they manipulate and leverage subcontractors but that's not the worst that can actually happen as a subcontractor it keeps going trust me all right so we're wrapped up for the day he finally got the wall all the way done and we got it all the way in based out built up now we just got to put caps on we have everything kind of tared up cuz there supposed to get rain tonight we'll see whatever happens in the morning but yeah now it's just basically back fill a little more and start putting caps on and and then this wall is officially wrapped up then we're onto the front wall all right good morning everybody but today we're we got the wall done yesterday hey now we're just going to basically start back filling getting it built up to the top here or or or to the back of the blocks it's a back fill we're going to get all the rest of this probably cleaned up up and we got rain coming today on and off so who knows how far we're actually truly going to get but we're going to try and get as much done as we can before it really really gets bad head and then if it's not too bad we might get might get into the front demo but that might be for another day so all right we're going to get into it [Music] now the reason I got out of doing commercial construction and lended leaned more into residential construction is partly because of what I'm about to tell you right now what I'm going to tell you is as a subcontractor you're more of a tool than a partner on a project let me explain the realization the aha moment came to me when I was bidding a 5,500 ft retaining wall it was around…