Backfilling and Compacting Reinforcement Zone

0:42
25:57
39.3K views

At 0:42 in

The CITY left one BIG Mess!

What happens here

After boulders are set, the skid steer is used to backfill the area directly behind the retaining wall and dry creek bed with suitable imported fill soil. This soil is spread in thin lifts, typically 6-12 inches, and then thoroughly compacted using a vibratory rammer. This layered backfilling and compaction process is crucial for creating a stable reinforcement zone, preventing soil erosion, and ensuring the long-term stability of the structures.

Goal: Backfill excavated areas and compact the soil in thin layers behind the newly placed boulders to ensure structural integrity and prevent future settlement.

Tools and materials

  • Kubota SVL 75-2 Compact Track Loader
  • Rake
  • Wacker Neuson BS50-4 Vibratory Rammer
  • Fill Soil (Imported)

What they say