Lay the Base Courses of Columns

0:04
0:24
1.6K views

At 0:04 in

The cherry on top will be a 🔥 bowl

What happens here

Begin constructing the 'massive columns' using the specified building blocks or stones (e.g., concrete blocks, natural stone units). Lay the first course directly onto the prepared foundation, ensuring each block is perfectly level and aligned according to the architectural plans. Use a high-strength mortar or structural adhesive to bond the blocks together, ensuring full coverage for maximum strength. As subsequent courses are laid, stagger the joints to enhance structural integrity. Continuously check for plumb and levelness to maintain straight and even column walls.

Goal: Begin the vertical construction of the columns, ensuring a level and stable base.

Tools and materials

  • Building Blocks/Stones Various — The primary structural material for the columns
  • Level Stabila — Checking horizontal and vertical alignment
  • Mortar/Structural Adhesive Quikrete — Bonding the building blocks together
  • Plumb Bob Various — Ensuring vertical alignment of the columns
  • Rubber Mallet Estwing — Gently tapping blocks into place for alignment
  • String Line Various — Maintaining straight lines for block placement
  • Trowel Various — Applying mortar or adhesive