Install Wall and Roof Panels

5:54
9:06
646.3K views

At 5:54 in

THE BARN IS UP, BUILT IN UNDER 4 HOURS A 24X36 STEEL BUILDING V/S POLE BARN PRO/CONS

What happens here

Once the main steel frame is complete, the exterior panels are installed. The workers attach pre-painted corrugated steel panels to the frame. The owner specifies 'pebble beige' for the side walls and anticipates a 'barn red' roof. These panels are fastened directly to the light gauge steel framing members, providing both structural enclosure and weather protection. The speed of panel installation further highlights the efficiency of light gauge steel construction, with workers moving quickly across the structure.

Goal: Corrugated steel panels, chosen in specific colors like 'pebble beige' for the sides and 'barn red' for the roof, are installed to enclose the structure and provide weather protection.

Tools and materials

  • Corrugated Steel Panels
  • Ladders/Scaffolding
  • Power Drills/Impact Drivers
  • Self-tapping Screws
  • Barn Red Paint
  • Pebble Beige Paint

What they say

Hide

alright guys here's a building update these guys have got the framework all up they've got to put the roof on it put the gable ends on right here we went with a pebbled beige on the side right here and we went with a barn red type roof all that stuff still on the trailer these guests are going to go put another building up later on today I guess that's with the roll-up doors and stuff are they probably knock out two or three of these buildings in a day sometimes a hard-working bunch of guys right here supervisors actually up here in the other guys are just kind of hanging out down here it's kind of funny but I've probably got another hour or so this building will be done so four hours four and a half hours boom thing is up looking good and we'll have a nice place to put our tractor and all of our implements so we got it done guys