Skip to main content

Continue Laying Subsequent Courses and Repeating Geogrid Installation

0:24
15:38
13.4K views

At 0:24 in

Thats a problem

What happens here

Continue the wall construction by laying subsequent courses of retaining wall blocks. Ensure each new block course is properly aligned and level. Depending on the wall's design and height, install additional layers of geogrid at specified intervals (e.g., every 2-3 courses). After each geogrid layer, backfill with appropriate material and thoroughly compact it using a plate compactor. This iterative process of block laying, geogrid, backfilling, and compaction ensures the wall's strength and longevity.

Goal: Build the retaining wall to its desired height with proper reinforcement.

Tools and materials

  • Geogrid — Reinforcing multiple layers of the wall
  • Plate Compactor Wacker Neuson — Compacting backfill material
  • Retaining Wall Blocks — Building up the height of the wall
  • Skid Steer ASV VT-70 — Transporting and spreading backfill
  • Spirit Level — Ensuring each course is level
  • Soil/Gravel — Backfilling the wall layers