Prepare Screed Bed Sections
0:38
10:37
20.2K views
At 0:38 in
Starting Our BIGGEST Patio Ever! INSANE BACKYARD Pt 13
What happens here
The crew begins preparing the screed bed by setting up screed pipes. These pipes are crucial for establishing the precise elevation of the paver base, ensuring it matches the existing door thresholds of the house and any adjacent structures. The design incorporates a subtle pitch for proper drainage. The strategy involves working in sections: screed a portion, lay pavers, then move on to screed the next area. This systematic approach allows for accurate leveling and efficient workflow.
Goal: Screed pipes are set to establish the correct elevation and pitch for drainage, preparing the base layer for paver installation in manageable sections.
Tools and materials
- Laser Level Bosch LR20
- Rakes
- Screed Pipe
- Shovels
- Screed Bed Material N/A