Perform Final Visual Inspection of the Repair

1:05
1:17
33.1K views

At 1:05 in

Service Call; Customer had LIVE Utility Wires Exposed! Tips how to fix a Strained Meter Socket⚡️

What happens here

Upon completion of all repairs, a final visual inspection is performed. The electrician confirms that the expansion coupling is correctly installed, the neutral wire splice is securely insulated, and the entire meter socket assembly is neat, secure, and free from exposed wiring. The appearance is described as 'really good,' indicating a successful and professional repair.

Goal: Verify the completeness and safety of the meter socket repair.

What they say

Hide

the 250 MCM from 250 MCM to six gauge. Put a shrink wrap around this. So you light this up and it's just going to contract. >> Light it up. Up. Light it up. >> Suck in. >> Nice. Looks good. That actually looks really good. That looks like a repair. Good stuff.