Final Backfilling, Grading, and Site Protection
12:40
14:50
69K views
At 12:40 in
Retaining walls- SPOTTING short cuts & BAD work
What happens here
With the wall nearing completion, the Kubota skid steer is used to backfill the area behind the entire retaining wall. Workers use rakes and shovels to spread the native soil evenly, grading it to flow seamlessly into the surrounding landscape. The narrator explains that native soils are used at the top of the wall so that homeowners can plant grass or other landscaping. The site is then prepared for potential rain, with any trenches or critical areas covered with tarps to protect against erosion and water damage.
Goal: Complete backfilling, integrate the wall into the landscape, and protect the site.
Tools and materials
- Bricks or Heavy Objects N/A — Weighing down tarps to prevent them from blowing away
- Kubota Skid Steer Kubota — Delivering and spreading large quantities of native soil
- Rakes — Spreading and leveling soil for final grading
- Shovels — Moving and spreading soil
- Tarps — Covering and protecting the site from rain
- Native Soils N/A — Final backfilling and grading of the wall