Retaining walls- SPOTTING short cuts & BAD work
What happens here
Once the trench is excavated, a worker uses a plate compactor to thoroughly compact the exposed soil base. This is a crucial step to eliminate any loose pockets and create a dense, stable foundation for the retaining wall. If the trench was over-excavated, Class 5 gravel is introduced and also compacted. The narrator explains that deeper and wider bases are preferable, provided the material is correctly compacted.
Goal: Create a robust and level foundation for the retaining wall.
Tools and materials
- Hearing Protection — Protecting ears from the noise of the plate compactor
- Kubota Skid Steer Kubota — Delivering Class 5 aggregate to the trench
- Plate Compactor Wacker Neuson — Compacting the soil and Class 5 aggregate
- Shovel — Spreading and leveling the Class 5 aggregate
- Class 5 Gravel N/A — Filling and compacting the base if over-excavated or to add extra stability
What they say
(1,369 characters)Hide
What they say
(1,369 characters)Auto-generated from the video audio.