Maintaining Subgrade Integrity During Excavation
At 3:21 in
Retaining Walls - Master Series- steps 1-4
What happens here
Stanley highlights the critical importance of not over-sizing or digging too deep into the subgrade. If the virgin soil beneath the planned 6 inches of base material (3/4 inch rock) is disturbed, it can create soft spots. While disturbed soil can be backfilled and compacted, it's never as stable as undisturbed ground. The ideal approach is to excavate precisely to the correct depth from the outset, minimizing the need for backfilling and ensuring maximum stability for the retaining wall foundation.
Goal: Emphasize careful excavation to avoid disturbing the virgin soil beneath the planned base layer. Over-digging and refilling can compromise stability due to potential soft spots.
Tools and materials
- Bobcat 325 Mini Excavator
What they say
(669 characters)Hide
What they say
(669 characters)Auto-generated from the video audio.