Maintaining Subgrade Integrity During Excavation

3:21
21:11
106.7K views

At 3:21 in

Retaining Walls - Master Series- steps 1-4

What happens here

Stanley highlights the critical importance of not over-sizing or digging too deep into the subgrade. If the virgin soil beneath the planned 6 inches of base material (3/4 inch rock) is disturbed, it can create soft spots. While disturbed soil can be backfilled and compacted, it's never as stable as undisturbed ground. The ideal approach is to excavate precisely to the correct depth from the outset, minimizing the need for backfilling and ensuring maximum stability for the retaining wall foundation.

Goal: Emphasize careful excavation to avoid disturbing the virgin soil beneath the planned base layer. Over-digging and refilling can compromise stability due to potential soft spots.

Tools and materials

  • Bobcat 325 Mini Excavator

What they say

Hide

now as blaine is digging one of the things i want you guys to make note of is how careful he is not to oversize his excavation or go too deep in it and this is an important thing because if the bottom of his subgrade his wall is here and then he's going to put six inches of base material three quarter inch rock on top of that if he disturbs this soil below that rock it can have soft spots if he digs too deep or over digs he's got to be careful that he puts the material back but then he compacts that area that he over dug so digging to the right depth right out of the gate is a lot better than guessing putting it back and fixing it we want virgin soil as much as

Auto-generated from the video audio.