Laying the First Course of Blocks
At 14:13 in
Retaining Walls - Master Series- steps 1-4
What happens here
Workers meticulously lay the first course of Versa-Lok Standard blocks directly onto the compacted gravel base. Each block is carefully positioned and leveled using a hand level and tapped into place with a rubber mallet. A string line is used as a guide to ensure precise alignment and a straight course. Any excess gravel is removed, and the blocks are checked for a snug fit. This foundational course dictates the stability and appearance of the entire retaining wall.
Goal: With the compacted gravel base in place, the first course of segmental retaining wall blocks is carefully laid. Precision in leveling and alignment at this stage is crucial for the entire wall's integrity.
Tools and materials
- Hand Level
- Rubber Mallet
- String Line
- Versa-Lok Standard Blocks
What they say
(562 characters)Hide
What they say
(562 characters)Auto-generated from the video audio.