Laying the First Course of Blocks

14:13
21:11
106.7K views

At 14:13 in

Retaining Walls - Master Series- steps 1-4

What happens here

Workers meticulously lay the first course of Versa-Lok Standard blocks directly onto the compacted gravel base. Each block is carefully positioned and leveled using a hand level and tapped into place with a rubber mallet. A string line is used as a guide to ensure precise alignment and a straight course. Any excess gravel is removed, and the blocks are checked for a snug fit. This foundational course dictates the stability and appearance of the entire retaining wall.

Goal: With the compacted gravel base in place, the first course of segmental retaining wall blocks is carefully laid. Precision in leveling and alignment at this stage is crucial for the entire wall's integrity.

Tools and materials

  • Hand Level
  • Rubber Mallet
  • String Line
  • Versa-Lok Standard Blocks

What they say

Hide

[Music] all right guys so as i'm sure a lot of you know being on the wall crew you're cutting blocks and all sorts of nasty stuff like that so as far as dust masks go i really like this style of them uh blaine had one like this for the longest time and i i just could not find one because uh it was when covet was first starting to really pop off um we finally got a couple of these sent to us this one in particular didn't last at all so the nose piece here you know that lasted i don't know maybe two weeks and the velcro was worn out after a month so that one

Auto-generated from the video audio.