Site Preparation and Debris Removal
17:19
27:08
50K views
At 17:19 in
Retaining Wall BLOWS Mud and block everywhere
What happens here
The team arrives at the second site, where another retaining wall has failed, creating a large hole behind it. The damaged area is covered with green tarps, which are then carefully removed by pulling out stakes and folding the tarps back. This action exposes the full extent of the collapse, revealing the missing soil and displaced sections of the wall, along with various debris like old bricks and roots. Initial manual debris removal is performed using shovels to clear the area before power washing.
Goal: Tarps are removed from a failed retaining wall, exposing extensive damage and debris, which the team begins to clear manually.