What happens here
After initial excavation, workers install a new window well cover to protect the basement window. Following this, a layer of gravel is spread in the trench and compacted using a plate compactor to create a stable, level base for the retaining wall blocks. This compacted gravel layer ensures proper drainage and structural integrity for the wall.
Goal: Prepare a stable and well-drained base for the retaining wall and protect basement windows.
Tools and materials
- Gravel — Creating a stable, drainage-friendly base for the retaining wall
- Plate Compactor NorthStar — Compacting the gravel base for stability
- Rake — Spreading and leveling the gravel
- Window Well Cover — Protecting basement windows from soil and water