Skip to main content

Install Window Well and Compact Base Layer

4:35
14:21
29.6K views

At 4:35 in

Regrading to Fix a Wet Basement. 4k start to finish landscape project

What happens here

After initial excavation, workers install a new window well cover to protect the basement window. Following this, a layer of gravel is spread in the trench and compacted using a plate compactor to create a stable, level base for the retaining wall blocks. This compacted gravel layer ensures proper drainage and structural integrity for the wall.

Goal: Prepare a stable and well-drained base for the retaining wall and protect basement windows.

Tools and materials

  • Gravel — Creating a stable, drainage-friendly base for the retaining wall
  • Plate Compactor NorthStar — Compacting the gravel base for stability
  • Rake — Spreading and leveling the gravel
  • Window Well Cover — Protecting basement windows from soil and water

What they say

Hide

wall so that's got to get moved over and set far enough away from the wall that if they ever needed to work on it they could do that [Music]

Auto-generated from the video audio.