Skip to main content

Second Side and Adaptability in Stone Placement

9:19
20:53
40.7K views

At 9:19 in

Rebuilding Retaining walls-Start to Finish

What happens here

The creator moves to the second side of the retaining wall. He discusses the principle of 'not getting married to a stone,' advising to try 2-3 flips to position it, and if it doesn't fit, to move on. He demonstrates this by repositioning a stone that didn't work for the framing of a door, highlighting the importance of adaptability and not getting stuck in a 'rut' during the creative process of landscaping.

Goal: Continue wall construction with adaptable stone placement

Tools and materials

  • ASV RT-75 Skid Steer
  • Large Boulders

What they say

Hide

the birds are making a nest up in my profit i can't even finish it all right well one of the things that i want to say that was told to me by a very wise man his name was brian from aquascape he told me don't get married to a stone give it two three flips if it doesn't fit don't get stubborn with it move on and it's easy to get married to a stone you look at one and you think this one i was married to i was a hundred percent sure that this stone was going to match up on the opposite side of the door with that seat stone right there so they would frame that door didn't work had to pick a different one didn't give it too much time you just don't give it too much time because you'll get stuck in us in a rut but we're stuck in a rut right now you guys we got a lot of the stuff put in place but now it's time to grade and clean up and just start working the site and then we're gonna find where the details come in we're gonna find where we gotta add an extra stone here or there but if i just stay in boulder placement mode right now i don't think i'm gonna do it i think i need to come in here and start working this and cleaning it up and then not being afraid to grab a stone here or there

Auto-generated from the video audio.