Prepare for Seat Stone Installation
5:20
20:53
40.7K views
At 5:20 in
Rebuilding Retaining walls-Start to Finish
What happens here
The area where a flat 'seat stone' will be installed is inspected. This location is next to a sliding glass door of the house. To ensure the seat stone sits at the correct height and allows enough clearance for the door and future trim, an existing section of old concrete pavement/brickwork must be removed. The compact track loader is used to break apart and clear away this material.
Goal: An existing concrete slab is removed to create a proper, level base for a 'seat stone' adjacent to the house door.
Tools and materials
- ASV Posi-Track RT-75
What they say
(1,388 characters)Hide
What they say
(1,388 characters)Auto-generated from the video audio.