What happens here

The initial grading phase begins, involving rough shaping of the terrain around the newly constructed retaining walls. This step does not yet address water drainage issues but establishes the basic layout for future refinement. The creator explains that this initial grading allows him to gain a better perspective of the potential final product, identifying both successful elements and areas needing further attention.

Goal: Roughly shape the terrain and assess the overall landscape vision

Tools and materials

  • ASV RT-75 Skid Steer

What they say

Hide

around the site the entire site has a lot of issues that still need to be corrected but by doing this initial grading in my work zone it allows me to get a better perspective of what the potential finished product on this retaining wall will look like good bad and in between it just helps me to clear things up so i can see what i've got to do in the next phases of this landscaping project [Music] all of these retaining walls are far from finished they still have to be towed in then all of the joint spaces where i plan on putting plants have to be filled in with organic material so that everything balances out plus the backfill on these retaining walls all has to be evened out and re-contoured to direct water away from the retaining walls lucy what do you think does it look good are we graded out hey enough enough enough quiet quiet now yo gray mare

Auto-generated from the video audio.